Industrial Building Addition Project Pictures
Simply click on the image below for a slide show highlighting the progress of the Applied Power Products Industrial Building Addition Project.
The final addition prior to seeding the lawn
The finished addition prior to seeding the lawn
How well the addition blended with the original building
A seamless transition from the original building to the new addition
Dock area
Setting drain pipes
The wall foundations are being prepped
Wall panels are delivered
Panels are carefully lifted off the trailer
Hoisting the panel
Bringing the panel into place
Setting and securing the panel to create the wall...
The exterior view of the panel to show the texture and color
Pouring the dock pads
A long arm reaches deep into the building to pour the floor
The freshly poured floor
Installation of overhead doors
Concrete curb installation
The driveway is installed
Sidewalks are formed & poured
Asphalt drive/parking lot and concrete curbs