Dan’s Tank Project Pictures
See the latest progress on the Dan’s Tank project in North Dakota:
final - dans tank construction (15)
Pre-construction
final - dans tank construction (10)
Steel framining
final - dans tank construction (16)
Exterior - roof & siding has been completed, overhead & access doors have been installed.
final - dans tank construction (17)
Exterior - roof & siding has been completed, overhead & access doors and windows have been installed.
final - dans tank construction (9)
Installation of heated floors
final - dans tank construction (3)
Completed area of concrete floor.
final - dans tank construction (13)
Duct work installation.
final - dans tank construction (1)
Lighting installation.
final - dans tank construction (12)
Interior build out and mezzanine construction.
final - dans tank construction (21)
Interior build out and mezzanine construction.
final - dans tank construction (19)
Drywall installation.
final - dans tank construction (8)
Hand wash area.
final - dans tank construction (11)
Office build out.
final - dans tank construction (2)
Break area cabinets.
final - dans tank construction (7)
Office finishes.
final - dans tank construction (6)
Bathroom finishes & shower.
final - dans tank construction (5)
Shower and cabinet located in bathroom.
final - dans tank construction (18)
Bathroom finishes, urinals of an updated design.